Guide · Units
Your minerals are in an oil and gas unit: what North Dakota law says
A thick envelope shows up with a proposed plan of unitization, a tract exhibit and a ratification form. Or you spot a well name on our daily NDIC pages with "Unit" in the spacing column. Either way, a unit changes how production from your minerals is counted. North Dakota's unitization statute spells most of it out, and this is how it reads.
Last reviewed:
The short version
A unit puts many separately owned tracts under one plan for one common source of supply, usually so the field can be run as a single project. Once the Industrial Commission's order is effective, each tract is credited with a share of everything the unit produces, whichever well it comes out of, and that share counts as production from your tract.[1] Your royalty is paid on that share, free of unit expense.[1]
The numbers that matter to you are in the plan of unitization, mostly the tract participation factor. Nothing here is legal advice. A unit plan is a long document, and if your interest is meaningful it's worth having a North Dakota oil and gas attorney read it with you.
A unit is not the same thing as a spacing unit
Most Bakken owners first meet the Commission through spacing and pooling. A spacing unit is the block of sections a well is drilled for, and a pooling order joins the interests in it so royalty follows your share of the unit acres. Our spacing units and pooling guide covers that.
Unitization under sections 38-08-09.1 through 38-08-09.17 is a different tool. The Legislature's stated purpose is unitized management and further development so that more oil and gas is recovered, waste is prevented, unnecessary wells aren't drilled and owners' correlative rights are protected.[1] Before the Commission can create one, it has to find that unit operation is reasonably necessary for pressure maintenance, repressuring, cycling, waterflooding or another joint effort meant to substantially increase ultimate recovery, that it will with reasonable probability recover substantially more than would otherwise come out, that the added cost won't exceed the value of the added oil and gas, and that it's for the common good of the owners.[1] A unit can cover two or more pools stacked in one field if the Commission orders it.[1]
You'll see both on the daily reports. On November 5 and 6, for example, the spacing unit listed for Burlington Resources' HBU Sagebrush permits was the Haystack Butte-Bakken Unit itself (NDIC daily report, November 6).
How a unit gets formed
Someone files a petition with a description of the proposed unit area, a map or plat, and a proposed plan of unitization the petitioners consider fair.[1] The Commission then sets a hearing. At least 45 days before it, the applicant has to give notice and mail a copy of the application and the proposed plan to each affected person owning an interest of record in the unit outline, at the last-known address. The applicant also has to file its engineering, geological and other technical exhibits with the Commission, and the notice has to say they're available for inspection.[1]
That mailing is the envelope. If you're an owner of record, you should get one, which is a good reason to keep your address current with the county recorder and with every operator that pays you. Our guide to NDIC hearing notices covers reading the docket, filing comments and appearing.
The ratification vote
A Commission order creating a unit doesn't take effect on its own. Under section 38-08-09.5 the plan has to be signed, ratified or approved in writing by the people who will pay more than 55 percent of unit costs and by the owners of more than 55 percent of the royalty interests. Overriding royalties, production payments and other interests carved out of the working interest don't count toward the royalty side.[1] When more than one party will pay costs, at least two unaffiliated cost-paying parties and at least two royalty owners have to be voluntary parties.[1]
If the required percentages haven't signed within six months of the order, the order lapses and the Commission revokes it.[1] So the ratification form in that envelope is a real vote, not a receipt. What you do with it is your call, but read the tract exhibit first and don't sign anything you haven't read.
Your tract's share
This is the heart of it. The plan has to allocate unit production among the tracts so each gets a fair, equitable and reasonable share. The statute says that share is measured by each tract's value for oil and gas purposes and its contributing value to the unit, compared with the other tracts, taking into account acreage, the oil and gas recoverable from it, location on structure, its probable productivity without the unit, and the burden of operation, or whichever of those factors and other engineering, geological or operating factors can reasonably be determined.[1]
Unit production means everything produced from the unit area after the order's effective date, no matter which well or tract it comes from.[1] The amount allocated to your tract, and only that amount, counts as production from your tract, whether it's more or less than any well on your tract actually makes. It's then paid out to the people who share in your tract in the same proportions they would have shared without the unit.[1]
In practice, the decimal on your check is built from your tract's factor in the plan rather than from the acres in a spacing unit. When the paperwork arrives, check three things: that the legal description of your tract is right, that the net acres match your records, and how the factor was worked out. Our division order guide shows how to check a decimal once you have one.
What a unit does and doesn't change
- Title stays with you. The unit doesn't take title to your tract or lease, and it doesn't own the unit production. The production and the money from it belong to the people it's allocated to.[1]
- Royalty is free of unit expense. Landowner royalty, overriding royalty and production payments allocated to a tract are paid free and clear of unit expense and of the unit's lien.[1] Cost-bearing owners carry the expense, and their liability is several, limited to what's charged to their own interest.[1]
- Leases are amended only as far as needed. Leases and contracts are treated as modified to the extent necessary to fit the unit plan and otherwise stay in full force.[1] Operations under the plan count as meeting the lease covenants for the unitized formation, and a well anywhere in the unit is treated as drilled on every tract in it.[1]
- Land outside the unit. If one lease covers land partly inside and partly outside the unit area, unit operations stop holding the outside land after the later of two years from the order's effective date or the end of the lease's primary term. After that, the outside land stays leased only under the lease's own terms.[1]
- Overhead is limited. A plan isn't fair and reasonable if its operating charges include district or central office expenses beyond reasonable overhead.[1]
If you're unleased
For unitization, the statute counts an owner of unleased minerals who has the right to develop them as a "lessee" to the extent of a seven-eighths interest.[1] The plan has to provide for owners who don't join in paying unit expense, and a risk penalty can apply: 200 percent of the share of unit expense if the interest comes from a lease or other development contract, 50 percent if it isn't leased. Either way it comes only out of unit production and not out of royalty.[1] Before a penalty can be charged, the paying owner has to have made a good-faith attempt to lease the unleased owner or get the leased owner to join, and has to give notice, with proof of service, that it intends to impose the penalty and that the owner may object at the Commission.[1]
If you own working interest or unleased minerals, our working interest vs royalty guide explains why that's a different position from a royalty owner's.
Changes later: enlargement, new operator, dissolution
A unit can be enlarged to take in adjoining parts of the same source of supply, or its plan amended, on the same terms as forming it.[1] There's a shortcut: royalty owners already in the unit don't have to ratify an enlargement if the people in the added area have ratified and the operator mails existing royalty owners a notice 30 to 40 days before the hearing. The notice has to describe the plan, give the participation factor for each tract in the current and proposed area, and state the hearing time and place. If 10 percent of the royalty or working interests in the existing unit file an objection with the Commission at least 10 days before the hearing, the enlargement then needs approval from more than 55 percent of all royalty and working interests in both areas.[1]
That notice matters because an enlargement usually changes every tract's factor. Read it when it comes, and compare your new factor with the old one.
The unit operator is chosen by the working interest owners under the plan, not by the Commission, and owners of a simple majority of the working interest can vote to change it.[1] Ten years after the unit agreement takes effect, royalty owners holding at least the percentage that was needed to ratify can petition the Commission to dissolve the unit. The Commission holds a hearing and won't dissolve it if that would likely cause waste or violate an owner's correlative rights.[1]
Anyone adversely affected by a unitization order can appeal to the district court of the county where the land, or part of it, lies.[1] The Commission's hearing docket index is where unit cases show up first.
If your minerals are in Montana
Montana's unit statute is in MCA Title 82, chapter 11, part 2, and the vote is set higher. A Board of Oil and Gas Conservation unit order doesn't take effect until the plan is approved in writing by those who will pay at least 70 percent of the costs and by owners of at least 60 percent of the production or proceeds credited to cost-free interests such as royalties, overriding royalties and production payments. If that doesn't happen within six months of the order, the board revokes it unless it extends the time for good cause.[2]
Montana also says operations on any part of the unit area count as operations on each tract, and production allocated to a tract counts as produced from that tract.[3] A division order or other contract for selling production from a tract isn't terminated by the unit order and keeps applying to the oil and gas allocated to the tract until it ends by its own terms.[4] For the rest of the Montana differences, see our Montana vs North Dakota comparison.
A checklist when the unit papers arrive
- Find your tract on the exhibit and check the legal description and net acres against your deed and your current check stub.
- Read how the participation factors were calculated and what your tract's factor is.
- Note the hearing date. The technical exhibits are on file with the Commission and the notice tells you they can be inspected.[1]
- Decide what to do with the ratification form after you've read the plan, and get advice if the interest is large.
- Keep everything. If the unit is later enlarged, you'll want the original factor to compare.
Questions about something in your packet? Write to offers@fortunionminerals.com.
A note on our interest
Fort Union buys minerals and royalty interests, so we have a commercial interest in this subject. Nothing in this guide depends on selling to us, and each statement comes from a public source listed below. Our editorial standards explain how we source and review our pages. If you ever want to know what we'd pay for your interest, the offer page is the way to reach us.
Sources
These are the sources behind this guide, in the order we first cite them. We read the sections each footnote names on November 13, 2026.
- N.D.C.C. chapter 38-08, Control of Oil and Gas Resources (sections 38-08-09.1 through 38-08-09.17, unitization) — North Dakota Legislative Assembly, North Dakota Century Code, read November 13, 2026. Sections 38-08-09.3 and 38-08-09.4 set what the Commission must find and what a plan of unitization must contain; 38-08-09.5 sets the 45-day mailed notice and the 55 percent ratification rule; 38-08-09.7 and 38-08-09.8 cover royalty free of unit expense, title and allocated production; 38-08-09.9 covers enlargement; 38-08-09.16 covers appeals.
- MCA 82-11-207, Approval of plan for unit operations by persons paying costs — Montana Legislature, Montana Code Annotated 2025, read November 13, 2026.
- MCA 82-11-211, Operations considered as done by all owners in unit — Montana Legislature, Montana Code Annotated 2025, read November 13, 2026.
- MCA 82-11-213, Contract not terminated by board order — Montana Legislature, Montana Code Annotated 2025, read November 13, 2026.
This guide is general information from public sources. It isn't legal or tax advice. For your own lease, title or check, talk to a North Dakota attorney.